Control and Supervision System (ABB Advant OCS) of the Power Plant, covering 4 Units (x 32 MW), 110 kV and 35 kV Switch yards and Auxiliary Systems.
The new-built Power Plant is located in the southern Chinese province of Guangxi. It is built on Xijiang River near the town of Guigang. Four power units with bulb-type turbines are installed in the plant, each one with capacity of 32 MW.